Part 1Which of the following was NOT a network planning method developed in the​ 1950s? A. the program evaluation and review technique​ (PERT) B. the network project analysis technique​ (NPAT) C. the critical path method​ (CPM)单项选择题

A

A. the program evaluation and review technique ​ (PERT)

B

B. the network project analysis technique ​ (NPAT)

C

C. the critical path method ​ (CPM)