The choice of a discount rate is very important in calculating a cost benefit ratio. In a project where the costs are incurred in the first 5 years and the revenues grow steadily over the remaining 25 years, what will be the effect of a high discount rate (say 15%) on the stream of benefits and costs over a 30-year period, compared to a low discount rate (such as 5%)? Select a single answer.单项选择题

A

It will significantly reduce the value of the costs

B

It will reduce the value of the costs

C

There is negligible effect because the project is over a long period

D

It will reduce the value of the benefits

E

It will significantly reduce the value of the benefits