You are close to the delivery date for a project but cannot guarantee that there are no errors in the system. Based on the further information provided in each statement, which of the statements provides a valid option:单项选择题

A
You deploy the system as it is currently, as the risks associated with failure of the system are not high
B
Since the delivery date is close, you deploy the system as you must deliver the system on time to meet the requirements of the contract
C
It is never acceptable to deploy a system with errors, so you keep testing until you can guarantee that the system is 100% error free
D
It is a high risk system, but you will use the direct cutover method to deploy the system on time to minimise the risk
登录即可查看完整答案
我们收录了全球超50000道真实原题与详细解析,现在登录,立即获得答案。
类似问题
A CI/CD pipeline automates build, test, and _____.
What is system deployment primarily about?
Is the following statement true or false? In the products of methylation-hydrolysis, every -OH group corresponds to the position of a glycosidic bond in the starting polysaccharide.
Which of the follwoing structures represents amylopectin?
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!