The primary cooling unit in a nuclear power plant has a reliability of 0.95. There is alsoa back-up cooling unit to substitute for the primary unit when it fails. The reliability ofthe back-up unit is 0.85. The cooling system of the plant is considered reliable if eitherone of the systems is working. Assuming that the two systems are independent, thereliability of the cooling system of the power plant is:单项选择题

A
a. 0.95
B
b. 0.8075
C
c. 0.9925
D
d. 0.85
登录即可查看完整答案
我们收录了全球超50000道真实原题与详细解析,现在登录,立即获得答案。
类似问题
If A and B are events such that Pr(A) = 0.35, Pr(A ∩ B) = 0.18 and Pr(B) = 0.38, thenPr(A ∪ B) is equal to
The sum of the probabilities over all possible outcomes must be 1.0.
Consider 100 i.i.d. random variables from an exponential distribution with 𝜆 = 1 3 . What is the variance of the sample sum 𝑆 100 ?
For a continuous random variable X, P(y<X≤x)=P(X≤x)−P(X≤y) for all values of x > y. c03.p019.q024 (Hint: sketch a number line with open/closed endpoints)
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!