Frey Company has two products: A and B. The annual production and sales level of Product A is 18,178 units. The annual production and sales level of Product B is 31,652. The company uses activity-based costing and has prepared the following analysis showing the estimated total cost and expected activity for each of its three activity cost pools: Frey Company's data Expected Activity Activity Cost Pool Estimated Cost Product A Product B Total Activity 1 $ 58,400 1,000 500 1,500 Activity 2 $ 80,000 200 800 1,000 Activity 3 $360,000 600 5,400 6,000 The following information is also available for Product A: Info for Product A Sales price per unit $23.00 Direct material per unit 6.00 Direct labor per unit 4.00 Please choose the correct number for each item of the profit margin report for Product A from an activity view. Profit Margin Report for Product A Sales [ Select ] $727,996 $236,314 $418,094 $411,476 Costs Direct Materials [ Select ] $109,068 $72,712 $189,912 $126,608 Direct Labor [ Select ] $72,712 $189,912 $109,068 $126,608 Activity 1 Overhead costs [ Select ] $38,933.33 $36,000.00 $272,713.00 $16,000.00 Activity 2 Overhead costs [ Select ] $36,000.00 $272,713.00 $16,000.00 $38,933.33 Activity 3 Overhead costs [ Select ] $272,713.00 $36,000.00 $38,933.33 $16,000.00 Product margin [ Select ] $38,933.33 $16,000.00 $272,713.00 $145,381.00多重下拉选择题
登录即可查看完整答案
我们收录了全球超50000道真实原题与详细解析,现在登录,立即获得答案。
类似问题
Which is not a step in activity-based costing?
Which is not a task typically associated with ABC systems?
Question2.4 If Risky Ltd used activity-based costing to allocate overhead costs, prime costs per unit of Job 701 would be (1 mark): Please do NOT input any commas or symbols other than the minus sign where necessary (e.g., -$1,000 should be entered as -1000). $ [input] Maximum marks: 1 Flag question undefined
Question2.3 If Risky Ltd used activity-based costing to allocate overhead costs, total machine set up costs allocated to Job 701 would be (1 mark): Please do NOT input any commas or symbols other than the minus sign where necessary (e.g., -$1,000 should be entered as -1000). $ [input] Maximum marks: 1 Flag question undefined
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!