What are the three point estimates used in PERT for each activity in terms of the duration? Select all that apply.多项选择题

A

The most likely time duration of an activity

B

The most optimistic duration of an activity

C

The most pessimistic duration estimate

D

The deterministic time estimates from CPM

登录即可查看完整答案

我们收录了全球超50000道真实原题与详细解析,现在登录,立即获得答案。

类似问题

更多留学生实用工具

加入我们,立即解锁 海量真题独家解析,让复习快人一步!