At the beginning of the period, the Assembly Department budgeted direct labor of $110,000, direct materials of $170,000, and fixed factory overhead of $28,000 for 8,000 hours of production. The department actually completed 10,000 hours of production. What is the appropriate total budget for the department, assuming it uses flexible budgeting? Round hourly rates to two decimal places. 单项选择题
A
$350,000
B
$378,000
C
$288,000
D
$305,000
登录即可查看完整答案
我们收录了全球超50000道真实原题与详细解析,现在登录,立即获得答案。
类似问题
Which budget evaluates the results of operations at the actual level of activity?
Flexing the budget means
Variable cost per unit and total fixed costs remain constant in the relevant range. Therefore, total fixed costs should not change with the change in activity level and you would take the variable cost per unit times the new activity level to generate the flexible budget line item.
When the activity level of the master/planning/static budget differs from the activity level (cost driver, allocation base; e.g., machine hours), then a flexible budget is needed to match the same activity level that the actuals are based on to truly analyze revenue and spending variances.
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!