Consider the following Java program. What is the output of the program?单项选择题

A
a. 20
B
b. Compilation error
C
c. 10
D
d. Runtime error
登录即可查看完整答案
我们收录了全球超50000道真实原题与详细解析,现在登录,立即获得答案。
类似问题
Consider the following Java program. What is the output of the program?
Consider the following Java program. What is the output of the program? class A { int x = 10; } class B extends A { int x = 20; public static void main(String[] args) { A obj = new B(); System.out.print(obj.x); } }
Project A has a required return on 9.2 percent and cash flows of −$87,000, $32,600, $35,900, and $43,400 for Years 0 to 3, respectively. Project B has a required return of 12.7 percent and cash flows of −$85,000, $14,700, $21,200, and $89,800 for Years 0 to 3, respectively. Which project(s) should you accept based on net present value if the projects are mutually exclusive?
You are considering two mutually exclusive projects. Project A has cash flows of −$72,000, $21,400, $22,900, and $56,300 for Years 0 to 3, respectively. Project B has cash flows of −$81,000, $20,100, $22,200, and $74,800 for Years 0 to 3, respectively. Both projects have a required 2.5-year payback period. Should you accept or reject these projects based on payback analysis?
更多留学生实用工具
希望你的学习变得更简单
加入我们,立即解锁 海量真题 与 独家解析,让复习快人一步!