1. In the context of reticulated services and construction management, which scenario best demonstrates poor coordination in design management?单项选择题

A

Engaging separate trades for electrical and telecommunications systems with a shared conduit plan.

B

Including electricity connection costs in the project estimate without considering SA Power Networks’ prescribed timelines.

C

Coordinating plumbing and gas installation to ensure a shared trench for cost efficiency.

D

Finalising structural drawings before confirming the required electricity load capacity for the building’s peak operation.